Delivery & Governance · 12 min read
How to Write an SOP in One Hour (and Get People to Use It)
A sixty-minute method for a standard operating procedure that fits on one page, is written by the people who do the work and is still alive a year later.

The most expensive document in my first business was a sticky note. It said "oven: back left, hold the door, count to three," and it was stuck to the oven, in the handwriting of a woman named Ruth who knew what the oven needed and had never needed to write it down. Ruth went on holiday for a week. The new person, a smart and willing teenager, followed the sticky note. The oven did not agree with the sticky note. We lost a morning's bread, and Ruth lost a little of her faith in humanity when she came back. Nobody was at fault. The knowledge existed, and it lived in one head, in three words and a gesture.
That is what an SOP is for. It is not paperwork. It is a way to move the knowledge in Ruth's head onto a page that a smart teenager can use, without making Ruth write a manual, which she would never do and should not have to. This article gives you a sixty-minute method, a one-page format, six reasons SOPs die and what to do about each, and a tool that writes the page for you. It is general information. The shop and the people in the examples are invented, and nothing here is safety, legal or regulatory advice.
If your procedures are part of a bigger process, the series Process teardown and the guide to process improvement: map, measure, fix show how to find which ones matter. This article is about writing one well, once you know.
What an SOP is, and what it is not
An SOP, a standard operating procedure, is a written way of doing a recurring job so that anyone trained can do it the same way and know when it is done. The words "standard" and "operating" sound grander than the thing. It can be a checklist on a card or six numbered lines on a page.
It is not a policy ("we value customer service"), which describes intentions. It is not a training manual, which teaches a whole role. It is not a rulebook for catching people out. And it is not, in a small business, a hundred-page binder. A binder that is never opened is a very heavy way of feeling organized.
What a good SOP does is four things: it makes the job repeatable, it makes it teachable, it makes mistakes visible and it makes the person who does it better the model for everyone else. That last one is why I like them. A good SOP is a compliment to the person it was copied from.
The one-page format
Seven lines. I use the same seven for almost everything, and a new person can read them in two minutes.
- Name. What it is, in plain words: "Opening the shop."
- Trigger. What starts it: "Every day we are open, thirty minutes before the doors."
- Owner and backup. One name each. The owner keeps it correct.
- Steps. Numbered, one line each, in order. Ten or fewer. If there are more, it is two procedures.
- Done looks like. What you can check at the end: "Ovens at temperature, drawer matches the sheet, door unlocked on time."
- If something goes wrong. The two most common problems and what to do: "If the drawer does not match, count again, then call Dana."
- Tested and reviewed. When someone new last tried it, and when it will be reviewed again.
Lines 5, 6 and 7 are the ones that people skip, and they are the three that make the difference between a list and a procedure. "Done looks like" lets a person check their own work. "If something goes wrong" turns panic into a plan. "Tested and reviewed" keeps it alive.
The sixty-minute method
Here is the plan, minute by minute. You will need the person who does the job best, a pencil and a phone, and one other person who has never done it.
Minutes 0 to 5: choose one procedure and one owner
Choose the one that hurts most when its person is away. Ask: "If Ruth is out for a week, which job do we dread?" Write its name. Name an owner, ideally the person who does it best, and a backup. If the owner is reluctant, say that the page is for them: it protects their holiday.
Minutes 5 to 25: walk it with the person who does it best
This is the heart of the hour. Do not ask the person to write the steps. People who are good at a job are bad at describing it, because much of what they know has become invisible. Instead, watch them do it, or ask them to walk through it as if you were new, and ask three questions at each step: what do you do, why do you do it this way and what goes wrong here?
Record it on your phone, or take notes. Photos help. The question "what goes wrong here?" will produce lines 5 and 6 of your page almost for free, and the question "why" will produce the tips that turn a step into a skill ("hold the door, because the oven loses heat and the bread collapses"). Resist the urge to improve the process in this session. First capture how it is done well. Improvements come later, as small, tested changes, in the spirit of kaizen for project managers.
Minutes 25 to 40: write it on one page
Now write it, using the seven lines. Use short sentences, plain verbs and the words the team actually uses. Write "turn on the ovens," not "initiate the heating process." If you have a photo that saves a paragraph, use it. Keep each step to one action.
If it will not fit on one page, you probably have two procedures. Split it. If you have more than ten steps, look for the point where a different person or a different moment takes over, and cut there.
Minutes 40 to 50: test it with someone who has never done it
This is the step that separates a document from a procedure. Ask a person who has never done the job to follow your page, out loud, while you watch and say nothing. Every time they hesitate, ask a question or do something differently from what you expected, mark it. Those marks are the missing steps and the unclear words. In a typical test, a one-page SOP gets six or seven marks. That is not a failure. It is the best ten minutes of the hour.
Minutes 50 to 60: fix it, name the owner and put it where it is used
Fix the marks. Write the tested date at the bottom. Put the page where the work happens: laminated at the oven, on the inside of the cabinet, in the folder on the tablet the crew actually carries. Tell the team it exists, in one sentence, and tell them the rule: if it is wrong, whoever notices fixes it and tells the owner.
Then stop. Resist writing a second one today. A single SOP that is used is worth more than ten that are filed.

Choosing the format
The one-page, seven-line format works for most jobs. For some jobs, another format fits better.
| Format | Best for | Example |
|---|---|---|
| Checklist | The same steps in the same order, every time | Opening and closing the shop |
| Numbered steps with a note | Steps where a person needs a reason or a tip | Setting up a customer account |
| Decision tree | Choices that depend on a condition | What to do when a delivery arrives damaged |
| Short video or photos | Things that are hard to describe in words | How to clean the machine |
A checklist is best when the steps are the same every time, like opening and closing. Numbered steps with a note suit tasks where a person benefits from a reason or a tip. A decision tree is for choices that depend on a condition: "if the delivery is damaged, take a photo, then..." And a short video or photo set helps for physical tasks that are awkward to describe, such as cleaning a machine. Keep videos under two minutes and put the numbered steps next to them, because people skim and cannot search a video.
Whichever format you use, keep the same seven lines in the same order. A team that learns to read one SOP learns to read all of them.
Six reasons SOPs die, and what to do about each
I have written hundreds of these and watched many of them die. The causes are few and repeatable.
| Why SOPs die | What keeps one alive |
|---|---|
| Nobody owns it | One named owner and a backup |
| Written by someone who does not do the work | Written with the person who does it best |
| Too long to read when you are busy | One page, steps numbered |
| Stored in a folder nobody opens | Kept where the work happens, at the point of use |
| Never tested | Tested with a person who has never done it |
| Never reviewed | A review date, and a rule: if it is wrong, whoever notices fixes it |
Nobody owns it. An SOP without an owner is out of date within a season. Name one person and a backup, and write the names on the page.
It was written by someone who does not do the work. The result describes how the work should be done in theory. The team sees the gap and ignores the page. Write with the person who does it best.
It is too long. A page that takes ten minutes to read will not be read in the middle of a rush. One page, ten steps or fewer.
It lives in a folder nobody opens. The best location is the point of use. If the job is at the oven, the SOP is at the oven. If the job is on a laptop, the SOP is a pinned note on the screen.
It was never tested. The first time a newcomer follows it is the first time the gaps appear. Test it before you declare it done.
It is never reviewed. Things change: a new machine, a new supplier, a new rule. Put a review date on the page. Add the rule that anyone who finds a mistake fixes it and tells the owner, so the page can improve without waiting for the review.
Which procedures to write first
You cannot write all of them, and you should not. I use a quick scoring. For each recurring job, ask three questions and give a point for each yes:
- Does it live in one person's head?
- Does a mistake cost real money, a customer or safety?
- Does it happen often enough to matter, at least weekly?
Start with the jobs that score three. For most small businesses, the first five are the opening and closing routine, the way a quote is made, the way a job is handed over, the way an invoice is sent and the way a complaint is handled. If the handoff is on your list, the handoff teardown gives a nine-field sheet that is itself a good SOP. If you run a restaurant or a shop, the restaurant opening checklist shows the idea for a day-one launch.
A note on safety, health and regulated work. Where a job involves safety, health, food handling, chemicals, regulated records or legal obligations, the procedure has to follow the rules that apply to you, and a qualified professional should review it. This article covers how to write a clear page. It does not tell you what the rules are.
Getting people to use it
Writing the page is the easy half. Getting people to use it is a habit, and a few things help.
Make it easier than the alternative. If the SOP is on the wall at the oven and the old way is "ask Ruth," the SOP must be faster than finding Ruth. Make it short, put it where the hands are and use pictures.
Praise the person it came from. In the first week, tell the team whose method this is: "This is how Ruth does it, because it works." It makes the page a compliment instead of a rule.
Use it in training. The first day for a new hire is the first test of every page. Have the newcomer follow the SOP and mark what is wrong. They see the gaps that nobody else can.
Make the fix easy. A pencil on a string next to the card, or a shared note, so anyone can mark a mistake. A page that can be improved by the people who use it will be used.
Do not use it as a stick. If the SOP appears in the conversation only when someone has made a mistake, people will hide the mistakes. Use it to make the work better, and when something goes wrong, fix the page first.
The change habits in a change management process for small teams apply here too: start with a first group, teach inside the work, name a helper and set a date for retiring the old way.

Can AI write the SOP for me?
A little. A tool can turn a recorded walkthrough or a rough set of notes into a clean draft in the seven-line format, which saves typing. It cannot know what actually happens at the oven, and it will happily produce an elegant procedure that does not match reality. So the rule is the same as for any AI draft: a person who does the job reads it, tests it with a newcomer and fixes it. Be careful about what you give a tool. Recordings and notes may contain customer or employee information, so use only tools you have checked and keep personal data out. The one-page AI policy covers the general limits, and the guide to automating your weekly status report shows the pattern for a different job.
SOPs and the rest of the system
An SOP is a small unit of a larger design. When several SOPs connect, they form a process, and the process has its own numbers and owner, which is the subject of process improvement. When a procedure keeps going wrong at the same step, that step is a candidate for the fix order: remove, simplify, standardize and only then automate, described in what an operations consultant does in the first 30 days. And when the knowledge is about decisions and not tasks, the right tool is a decision log and a clear list of who decides what.
If you want help seeing where procedures fit in a flow, the lean project management guide gives a vocabulary for waste, and lightweight project governance keeps decision rights simple.
The hall of fame of SOP mistakes
- The 80-page binder. Weighs a lot, read never.
- The SOP about the job, not from the job. Written by someone who has not done it in years.
- The SOP that is a threat. It appears only when someone has made a mistake.
- The untested SOP. Missing the step everyone does without thinking.
- The orphan. The owner left and nobody noticed.
- The perfect SOP for the wrong job. A beautiful page for a task that happens twice a year.
- The SOP in a folder. On the shared drive, three levels down, in a file called "final v3 (2)".
- The SOP that never changes. The oven has been replaced twice.
Try it: the one-page SOP builder
Fill in the seven lines, and the tool writes the page and tells you which lines are empty or vague. The example is an invented shop; replace it with a procedure of your own.
What to do this week
Pick one procedure that lives only in one person's head. Book sixty minutes with that person and one newcomer, and run the plan above: choose, walk, write, test and fix. Put the page where the work happens and write a review date on it. At your next weekly meeting, ask a single question: what went wrong this week that an SOP would have prevented? That list is your next five.
If you would like help choosing and writing your first five, tell me about your business and I will reply; I read every message. The About page explains how I work, the two-minute diagnostic shows which engine of your business needs attention first, and the free templates include one-page sheets for procedures and checklists.
Which procedure lives only in one person's head in your business, and what would break if that person were out for a week? Tell me in the comments. I read every one, and I will not tell Ruth.
General information, not legal, safety, health or regulatory advice. Where a procedure involves safety, health, food handling, chemicals, regulated records or legal obligations, follow the rules that apply to you and have a qualified professional review it. The shop and the people in the examples are invented. I have not reviewed any specific business.
Frequently asked questions
What is an SOP, and how long should it be?
A standard operating procedure is a written way of doing a recurring job so anyone trained can do it the same way and know when it is done. For a small business it should fit on one page: a name, a trigger, an owner and backup, up to ten numbered steps, what done looks like, what to do if something goes wrong and when it was last tested and will be reviewed.
How do you write an SOP in one hour?
Spend five minutes choosing one procedure and an owner, twenty walking through it with the person who does it best while asking what they do, why and what goes wrong, fifteen writing it on one page, ten testing it with someone who has never done the job and ten fixing it and placing it where the work happens.
Why do SOPs fail?
Usually because nobody owns them, they were written by someone who does not do the work, they are too long, they are kept in a folder nobody opens, they were never tested with a newcomer or they are never reviewed. Each has a fix: name an owner, write with the best person, keep it to one page, put it at the point of use, test it and set a review date.
Can AI write an SOP?
It can turn a recorded walkthrough or rough notes into a clean draft in a standard format. A person who does the job must still read it, test it with a newcomer and correct it, because a tool cannot know what actually happens. Keep customer and employee data out of tools you have not checked.
Everything new, once a month.
One email on the 1st of every month with everything new: articles, series parts, news, website updates, project results, where I am working and the business opportunities I am looking at. No spam.
- Fresh on the site right now
- ArticleThe Decision Log: The Cheapest Insurance a Team Can Buy
- NewsA $58 million plaza, a global design contest and a 2031 goal: what a project manager sees in Salt Lake City's Civic Center plan
- SeriesThe delivery: keeping the work and the customer moving
Join the conversation
Did this help? A quick reaction tells me what to write next.
Be the first to react.

Loading comments…