Project page opened. The scoreboard starts at zero on purpose: results will be posted here as they exist, wins and losses alike.
Ventures · Trading research
Trade Arena
Building a trading bot the slow, honest way: test it, break it, publish it, repeat.
In developmentOverview
Trade Arena grows from a simple interest of mine: building a trading bot. The trading arena is a place where luck looks a lot like skill, so the whole project is designed to tell the two apart.
The plan is to evaluate many different strategies, run each one through a backtest and then through a battery of robustness tests, and publish the results, failures included, until one shows genuine potential. Only a strategy that earns it moves on to a forward test in real time and, if it still holds up, to live trading with strict risk limits.
It is project management applied to a messy problem: a clear pipeline, clear pass or fail rules decided in advance, and honest reporting even when the answer is "this one does not work".
- Many strategies tested, not one favorite
- Every result published, wins and losses
- Nothing goes live until it has earned it
The scoreboard
Honest from the first day.
Everything starts at zero. These numbers move only when a strategy earns it, and they will be updated in public.
The pipeline
How a strategy earns real money.
- 01
Hypothesis
Write down why the strategy should work before looking at any data. No story after the fact.
- 02
Backtest
Simulate it on historical data including fees and slippage, so the numbers are not flattering fiction.
- 03
Robustness
Out-of-sample and walk-forward tests, parameter sensitivity and Monte Carlo runs. If a small change breaks it, it was luck.
- 04
Publish
Post the method and the results here, including the ones that failed. Unpublished tests do not count.
- 05
Forward test
Run it on live data with simulated money to see how it behaves outside the lab.
- 06
Live, small
Only if everything above holds: small size, hard risk limits and a kill switch.
Trade Arena is a research and engineering project. It is not investment advice, a recommendation or an offer to manage anyone's money. Trading involves substantial risk of loss, and backtested or simulated results are hypothetical and do not guarantee future performance.
Project control
Schedule, critical path and constraints.
The big picture of this project as a project manager would run it. Tap or hover a bar to see what it depends on and whether each constraint has been released.
Critical path
The critical path appears once the dates are confirmed.
Constraints
- PendingPass/fail rules written before the first testResearch pipeline and pass/fail rules · Owner: Dennis · Needed by Dec 15, 2026
- PendingRobustness tests passed (nothing goes live until it has earned it)Forward test with simulated money · Owner: Dennis · Needed by Jul 31, 2027
Working plan updated Oct 29, 2026. Dates and constraints are estimates and working assumptions, and they will move; progress shows "as planned" until it is reported. This is not a promise, a commitment or an offer to sell or invest.
Roadmap
Where it stands.
- Define the research pipeline and the pass/fail rulesIn progress
- Build the backtesting setupNext
- Evaluate strategies and publish the resultsNext
- Robustness testing of the best candidatesNext
- Forward test with simulated moneyNext
- Live, small and risk-limited (only if earned)Next
Updates
Latest news.
Keep exploring
Related reading.
The 90-Day Sprint: How Startups Use Project Focus to Find Their First Customers
Ninety days, three projects, one scoreboard. A practical way for startups to build leads, operations and sales at the same time.
Interactive tool: Build your 90-day sprint
115
Automate the Boring Stuff: 7 Workflows Every Small Business Should Run on Autopilot
Seven repetitive workflows that quietly eat your week, and how to hand them to automation.
Interactive tool: How many hours could you get back?
Say hello
Let's talk.
A question about a project, an article, a product or a partnership? Write to me, or pick a time for a short call.