Llama Purisima

A zinc, lead and silver exploration project in the Peruvian Andes, now validating the geology with diamond drilling.

In validation

Overview

Llama Purisima is a polymetallic exploration project in the Ancash region of Peru's central Andes. The targets are zinc, lead and silver hosted in limestone, in a region known for carbonate-replacement and skarn deposits. The company behind it, SMRL Llama Purísima, holds about 2,000 hectares of titled mining concessions and applications in regular processing.

At surface, the mineralized structure has been mapped for roughly 1.2 to 1.5 km along strike, with a visible outcrop width of about 45 to 60 m. An oxidized cap of zinc and lead carbonates gives way to sulfides (galena and sphalerite) within 1 to 2 m in test pits. Structure and geochemical markers also point to a possible heat source at depth, which drilling is meant to test.

The project is now in its validation phase: diamond core drilling to confirm what the surface suggests. Everything beyond that, including any resource estimate, depends on what the core shows. I work on it the way I work on any project, with a clear scope, milestones, owners and reporting, and I make the introductions that technical and capital partners need.

  • About 2,000 hectares in the Ancash region, Peru
  • Zinc, lead and silver mineralization exposed at surface
  • Certified assays from 2008 and 2024 (SGS del Perú)
  • District road reaches the structure, so drill rigs can drive in
  • Now in diamond drilling validation
~2,000 haLand package
1.2–1.5 kmMapped strike length
45–60 mVisible outcrop width
2,800–4,000 mElevation range

Field photos

What the outcrop looks like.

Selected photos from the project area. They were enhanced for resolution, clarity and exposure only, with nothing added or removed. Location stamps and people have been left out.

Outcrop zone on the hillside, with zinc carbonate and zinc-lead-silver sulfides.
Lead sulfide (grey-blue) and zinc carbonate (brown) exposed at surface.
Zinc carbonate and iron oxides dominate the surface along the ridge.
Grey-blue sulfide veinlets in oxidized limestone.
Dark sulfide-bearing zones within oxidized, ochre-colored rock.
Face of a small adit exposing mineralized rock (lead, silver and zinc).
Oxidized surface rock rich in carbonate.
Sulfide fragments recovered from a shallow excavation.

Surface results

What the lab says so far.

Results from certified assays of surface and trench samples. The full certificates are part of the data room.

> 30% PbSurface sample, 2024 (SGS del Perú). Above the lab's upper reporting limit.
19–30% ZnTrench and underground channel samples, 2008 (SGS). Lead in the same samples: 21–22%.
2–6 oz/t AgTrench and channel samples, 2008. The 2024 surface sample returned about 4.2 oz/t.

These are results from selected samples. They are not representative of the whole structure and they are not a mineral resource or reserve. Only systematic drilling and a compliant technical report can say how much, and at what grade.

The geology

What drilling will test.

A schematic cross-section drawn from field mapping and test pits. Only the first meters are observed. Everything deeper is a hypothesis for the drill to confirm or reject.

possible intrusive source 0 m100 m200 mSurface

Tap a layer to see what it is.

Schematic and not to scale. It illustrates the geological model being tested and is not a resource estimate.

Site and access

Built for drilling.

Access

A paved national highway reaches the region, and a district road crosses the structure, so drill rigs and heavy transport can drive in without new road building.

Season

A long dry season from April to November allows continuous fieldwork. Rains come from December to March.

Terrain

Elevations run from about 2,800 m in the valleys to 4,000 m on the ridges, a steep profile that suits horizontal adits and declines.

The work program

From surface to a first resource.

A staged plan, with a decision point after each stage. Stage two is where the project is today.

  1. 01

    Surface target delineation

    Detailed geological and structural mapping at 1:2,000, continuous channel trenching, ground magnetics and induced polarization (IP) to define the drill targets.

  2. 02

    Diamond drilling validation Current phase

    A first campaign of 4,000 to 6,000 m of HQ/NQ core testing the mineralized horizons between 60 and 200 m deep, with first metallurgical tests and a maiden resource estimate under NI 43-101 or JORC.

  3. 03

    Infill drilling and a first economic study

    6,000 to 10,000 m of infill and extension drilling, a pilot flotation program and a preliminary economic assessment (PEA).

Drill log

Hole by hole.

Each hole is published here only after the project geologist has logged and reviewed the core. Nothing appears before that.

The validation phase is under way. Logged and reviewed holes will appear here as the results come in.

Take part

Work with the project.

Ways to take part

  • Joint venture or earn-in tied to drilling milestones
  • Acquisition of the concessions
  • Technical or exploration consortium

In the data room

  • Concession registry titles and boundary surveys
  • Geological reports and full SGS assay certificates (2008 and 2024)
  • Thin-section petrography
  • The investor teaser and an on-site visit with independent check sampling

Everything above is shared after an expression of interest and a signed non-disclosure agreement.

Llama Purisima is an exploration-stage project. Exploration targets and surface sample results are not mineral resources or reserves, and there is no guarantee that drilling will confirm economic mineralization. Nothing on this page is an offer to sell, or a solicitation of an offer to buy, any security or interest in the project. Information is shared only with qualified counterparties, under appropriate agreements and applicable law. Please take your own technical, legal and financial advice.

Project control

Schedule, critical path and constraints.

The big picture of this project as a project manager would run it. Tap or hover a bar to see what it depends on and whether each constraint has been released.

On trackStatus: progress not reported yet, shown as planned
29%Done, against 29% planned
Jan 29, 2027Next: First reviewed holes in the drill log
Mar 31, 2027End of the critical path
0/4Constraints released
PartnersTechnical and capital partner conversations in progress
CapitalOpen to technical and capital partners; the investor teaser is sent on request
ProgramThree-stage work program, stage 2 (diamond drilling validation) under way

Completed: ✓ Land package consolidated (about 2,000 hectares)✓ Surface mapping, sampling and certified assays

Schedule
Task
Sep 26OctNovDecJan 27FebMarAprMayJunJulAugSepOctNovDecJan 28FebMarApr
Diamond drilling validationOct 1, 2026 to Mar 31, 2027
Technical and capital partner conversationsOct 1, 2026 to Mar 31, 2027
First reviewed holes in the drill logJan 4, 2027 to Jan 29, 2027
Maiden resource estimate (NI 43-101 or JORC)Dates to be confirmed
Infill drilling and first economic studyDates to be confirmed
Critical pathOther tasksDates to be confirmedRecurringConstraints pendingAll released

Critical path

  1. Diamond drilling validationOct 1, 2026 to Mar 31, 2027
  2. Technical and capital partner conversationsOct 1, 2026 to Mar 31, 2027

A delay in any of these moves the end date. The other tasks have some float.

Constraints

  • Pending
    Field conditions and accessDiamond drilling validation · Owner: Project team · Needed by Mar 31, 2027
  • Pending
    Approvals required for the work programDiamond drilling validation · Owner: Project team · Needed by Dec 31, 2026
  • Pending
    Laboratory turnaround for the assaysFirst reviewed holes in the drill log · Owner: Laboratory · Needed by Jan 29, 2027
  • Pending
    Review by a qualified person (geologist) before any estimate is publishedMaiden resource estimate (NI 43-101 or JORC) · Owner: Qualified person · Needed by Apr 1, 2027

Working plan updated Oct 29, 2026. Dates and constraints are estimates and working assumptions, and they will move; progress shows "as planned" until it is reported. This is not a promise, a commitment or an offer to sell or invest.

Roadmap

Where it stands.

  1. Land package consolidated (about 2,000 hectares)Done
  2. Surface mapping, sampling and certified assaysDone
  3. Diamond drilling validationIn progress
  4. Technical and capital partner conversationsIn progress

Updates

Latest news.

Project page expanded with field photos, surface assay highlights and the work program. The project is in its diamond drilling validation phase.

Say hello

Let's talk.

A question about a project, an article, a product or a partnership? Write to me, or pick a time for a short call.